Anyu Photovoltaic Energy Group

Binzhou City Enterprise Projects

1. Type: Industrial and Commercial Energy Storage 2. Project Name: Binzhou City 3. Installed Capacity: 382 kW of photovoltaic power with Longi 650 W modules, coupled with a 480 kWh battery system 4. Project Advantages and Features: Maximizing on-site self-consumption


Details

Jinxiang County Project, Jining City

1. Type: Industrial and Commercial Energy Storage 2. Project Name: Jinxiang County, Jining City 3. Installed Capacity: 1 MW of LONGi photovoltaic system plus 2,050 kWh of energy storage 4. Project Advantages and Features: Newly constructed factory building with no transformer, eliminating transformer installation costs and grid connection fees 5. Application Scenario: Fully self‑generated and self‑consumed, completely independent from the grid, achieving on‑site power production and consumption


Details

Project in Zoucheng City, Jining Municipality

1. Type: Industrial and Commercial Energy Storage 2. Project Name: Zoucheng City, Jining Municipality 3. Installed Capacity: 220 kW photovoltaic + 240 kWh battery storage 4. Project Advantages and Features: The clubhouse operates on commercial electricity rates, which are expensive, and power consumption peaks until 10:30 PM. 5. Application Scenario: Maximizing self-consumption; surplus energy is stored in batteries, covering more than 90% of daily electricity needs.


Details

Project in Wudi County, Binzhou City

1. Type: Industrial and Commercial Energy Storage 2. Project Name: Wudi County, Binzhou City 3. Installed Capacity: 380 kW photovoltaic + 480 kWh energy storage 4. Project Advantages and Features: Self‑generated electricity for on‑site buildings, 24‑hour power supply, with an hourly consumption of 120 kWh 5. Application Scenario: Maximizing self‑consumption—during midday, when the battery is fully charged, peak‑demand discharging of the 480 kWh capacity fully covers all peak‑time electricity needs.


Details

Shandong, Heze, Shan County Project

1. Installation Location: Shan County, Heze, Shandong Province 2. Application Scenario: Fiberglass Manufacturing Plant 3. Photovoltaic Capacity: 210 kW 4. Inverters: Two 110 kW HYA units 5. Energy Storage: 480 kWh commercial‑industrial battery storage system 6. Project Advantages: A single integrated system that simultaneously delivers: ① dynamic capacity expansion, ② demand‑response management, and ③ peak‑valley arbitrage.


Details

< 1234...9 >