Dezhou Aolai Rescue 5.9 MWp Fully Grid-Connected Project
The 5.9 MWp full‑grid‑connected project in Dezhou, Oulai Rescue, utilizes LONGi 585 W anti‑dust modules.
The Shian Chemical Project is located in Renlijiji Town, Qihe County, Dezhou City, with a total installed capacity of 3,775.45 kW, and construction commenced in 2022.
The Zhengzhou Dafeng project is located in the Yangcheng Industrial Zone of Dengfeng City, Henan Province, with a total capacity of 1,031.59 kW. It utilizes 42.85% of LONGi’s 575 W anti‑dust‑accumulation modules and 57.15% of flexible modules, effectively addressing the issue of insufficient roof load-bearing capacity.
Liangshan Berger Paint Industry Project
The Liangshan Berger Paint Industry Project, with a total capacity of 840 kW, is located in Liangshan County, Jining City, Shandong Province. This project integrates three distinct installation methods—roof‑mounted, ground‑mounted, and carport‑mounted—and was completed in August 2024.
Tri-Element Biotechnology Project
The Sanyuan Biotechnology Project, located in Binzhou City, Shandong Province, has a total installed capacity of 4,376.98 kW. The project was developed by Shandong Sanyuan Biotechnology Co., Ltd., with phased investments carried out from September 2022 to May 2024 across eight construction phases.
Xiajin Xingshi Textile Project
The Xingshi Textile Project in Xiajin, with a total capacity of 2,099.82 kW, is located in Xiajin County, Dezhou City. The project was completed and connected to the grid for power generation in March 2022.