Shi’an Chemical Project

The Shian Chemical Project is located in Renlijiji Town, Qihe County, Dezhou City, with a total installed capacity of 3,775.45 kW, and construction commenced in 2022.


Details

Zhengzhou Dafeng Project

The Zhengzhou Dafeng project is located in the Yangcheng Industrial Zone of Dengfeng City, Henan Province, with a total capacity of 1,031.59 kW. It utilizes 42.85% of LONGi’s 575 W anti‑dust‑accumulation modules and 57.15% of flexible modules, effectively addressing the issue of insufficient structural load-bearing capacity of the factory building.


Details

Liangshan Berger Paint Industry Project

The Liangshan Berger Paint Industry Project, with a total capacity of 840 kW, is located in Liangshan County, Jining City, Shandong Province. The project integrates three distinct installation types—rooftop, ground‑mounted, and carport—and was completed in August 2024.


Details

Tri-Element Biotechnology Project

The Sanyuan Biotechnology Project, located in Binzhou City, Shandong Province, has a total installed capacity of 4,376.98 kW. The project was developed by Shandong Sanyuan Biotechnology Co., Ltd., with phased investments carried out from September 2022 to May 2024 in eight construction stages.


Details

Xiajin Xingshi Textile Project

The Xingshi Textile Project in Xiajin has a total capacity of 2,099.82 kW and is located in Xiajin County, Dezhou City. The project was completed and connected to the grid for power generation in March 2022.


Details

Xiajin Xinglong Textile Project

The Xinglong Textile Project in Xiajin, with a total installed capacity of 1,899.77 kW, is located in Xiajin County, Dezhou City. The first phase of the project was completed in February 2022, and the second phase was finished and connected to the grid in April of the same year.


Details